MNRE Empanelled EPC · PM Surya Ghar Up to ₹78,000 Direct Subsidy · TANGEDCO Net Metering Demo Theme by Acutus Digital Dynamics
Acutus Solar
Solar Savings Calculator TOPCon Hardware Stack Tamil Nadu Case Studies Subsidy & EB FAQs Residential & Commercial Plans Book Free Roof Survey
Coimbatore · Chennai · Madurai · Trichy · Salem

Cut Your TANGEDCO EB Bill by Up to 90% With Tier-1 Solar.

Monocrystalline N-Type TOPCon bifacial panels with 25-year output warranty, elevated cyclone-rated GI structures that keep your terrace usable, and complete PM Surya Ghar DBT subsidy filing.

  • Zero-Drill Chemical Anchor Waterproofing
  • 7% SBI / Canara JanSamarth Loan Support
  • Real-Time Mobile Generation App
  • 5-Year Free Preventive Maintenance
₹78KDirect DBT Subsidy
25 YrsOutput Warranty
1,420+TN Roofs Powered

Instant Solar & Subsidy Calculator

Slide your typical bi-monthly Tamil Nadu EB bill to size your rooftop plant and 7% loan EMI.

₹8,000 / 2 mo
Recommended Plant3 kW On-Grid
Govt Subsidy / Benefit₹78,000
Est. Annual Savings₹33,696 / yr
Approx. Payback2.8 Years

Lock This Quote & Book Free Roof Inspection
Zero Paperwork Hassle

Installed & Net-Metered in 14 Days

Our dedicated TANGEDCO liaison engineers handle portal registration, technical feasibility, CEIG approvals (for C&I), and bi-directional meter commissioning.

STEP 01

Free 3D Shadow Audit

Drone & sun-path shadow simulation at your home or factory roof across Tamil Nadu to maximize annual kWh yield.

STEP 02

PM Surya Ghar & EB Filing

We submit your National Portal application, Aadhaar-linked subsidy request, and TANGEDCO net-metering feasibility.

STEP 03

2-Day Cyclone-Proof Install

Hot-dip galvanised 80-micron elevated structures, DCR TOPCon modules, ACDB/DCDB lightning arresters, and Wi-Fi app setup.

STEP 04

Net Meter & ₹78K DBT

Bi-directional EB meter swap and direct bank transfer of your central government subsidy within 30 days of commissioning.

No Unbranded Components

Built for Coastal Humidity & 45°C Summers

Cheap solar systems degrade rapidly in Chennai salt-air and Coimbatore summer heat. Every Acutus Solar plant uses bankable Tier-1 certified hardware.

01 / Solar Modules

N-Type TOPCon Bifacial (DCR)

Up to 22.8% cell efficiency with superior low-light monsoon performance and zero LID degradation. 100% DCR compliant for PM Surya Ghar subsidy.

Adani / Waaree / Tata · 25-Yr Linear Output Warranty
02 / Inverters & Storage

IP65 Smart String & Microinverters

Track real-time unit generation and EB export from your phone. Optional LiFePO4 hybrid backup banks for seamless AC & lift operation during outages.

Sungrow / Fronius / Enphase · 7 to 15-Yr Warranty
03 / Mounting & Safety

Elevated Usable-Terrace Gazebo

8-foot elevated hot-dip GI/aluminium structures let you walk, dry clothes, or host evenings underneath while cooling your concrete ceiling by 4°C.

170 km/h Wind Rated · Hilti Chemical Anchors + Earthing
Transparent Benchmarks

Residential & Industrial Plant Specs

Plant SizeRoof AreaMonthly UnitsPM Surya Ghar Subsidy
3 kW On-Grid240 sq.ft.~360 Units₹78,000
5 kW On-Grid400 sq.ft.~600 Units₹78,000
8 kW Hybrid / On-Grid640 sq.ft.~960 Units₹78,000
10 kW Villa System800 sq.ft.~1,200 Units₹78,000
Residential rooftop monocrystalline solar array
C&I CapacityIdeal ForPaybackTax Advantage
50 kW Shed MountCNC Units & Hospitals2.6 Yrs40% Accelerated Depr.
150 kW IndustrialSpinning & Textile Mills2.4 Yrs40% Accelerated Depr.
300 kW Campus GridSchools & Colleges2.3 YrsZero CapEx OPEX Option
500 kW HT CaptiveCold Storage & Foundries2.1 Yrs40% Accelerated Depr.
Commercial industrial rooftop solar plant
Proven Yield Across Tamil Nadu

Recent Rooftop Commissioning Log

Inspect a Live Site Near You
5 kW elevated villa rooftop solar in Coimbatore
Saravanampatti, Coimbatore · 5 kW On-Grid

Elevated Terrace Villa Plant

Installed with an 8-ft shaded pergola structure above the terrace. Bi-monthly TANGEDCO bill dropped from ₹9,800 to ₹380 minimum charges.

Subsidy: ₹78K CreditedYield: 640 kWh/mo
150 kW garment factory solar roof in Tiruppur
Avinashi Rd, Tiruppur · 150 kW C&I

Knitwear Export Mill Shed Array

Non-penetrating standing-seam aluminium rails preserving roof sheet warranty. Offsets 68% of daytime sewing & compressor load.

Saves: ₹1.75L / moPayback: 2.3 Yrs
8 kW hybrid coastal solar villa on ECR Chennai
ECR, Chennai · 8 kW Hybrid LiFePO4

Coastal Villa With Lithium Backup

Marine-grade anodized aluminium structure engineered for ECR salt breeze, running 3 inverter ACs effortlessly during grid faults.

Backup: 15 kWh LFPZero Outages
Straight Technical Answers

Common Questions From Tamil Nadu Homeowners

Everything you need to know about PM Surya Ghar subsidy transfers, roof waterproofing, and cloudy-day performance.

Once our engineers install the plant and TANGEDCO completes net-meter verification, the subsidy is typically transferred via DBT directly into your bank account within 21 to 35 working days.
No. We use Hilti chemical-anchored epoxy fasteners sealed with elastomeric waterproof collars, or non-penetrating concrete ballast blocks where preferred—backed by a 5-year leak-free guarantee.
For lineman safety, standard On-Grid inverters pause during grid outages (anti-islanding). If you want automatic backup during cuts, choose our Hybrid LiFePO4 battery system or keep your existing home UPS.
A simple 10-minute water rinse once every 15 days keeps yield at peak efficiency. Our elevated frames include a built-in sprinkler line option for effortless one-valve washing.
Free Engineer Site Visit

Get Your Exact Rooftop Proposal

Zero-obligation roof inspection with 3D shadow simulation, SBI/Canara 7% solar loan EMI chart, and TANGEDCO approval check.

Coimbatore HQ: Avinashi Road, Peelamedu, Coimbatore 641004
Chennai Desk: OMR Thoraipakkam & Anna Nagar East
Direct Solar Helpline: +91 90000 XXXXX · WhatsApp · info@example.com